Nameplate speed on a paper cup machine is a mechanical maximum measured with one board grade, one cup size and no defects counted. Real output is 75 to 85 per cent of that figure, so a machine rated at 120 cups per minute delivers about 95 to 100 in a normal shift, and the gap is set by the side-seam heater, the bottom curling station and the board's stiffness rather than by the main drive.
How is speed actually rated?
In cups per minute at continuous running, on a stated board of 250 to 300 gsm polyethylene-coated cup stock, with a stated cup size, excluding startup, jam clearance and reel changes. A 200 cups per minute figure quoted without a board grade is a drive-motor figure. Ask for the rated board, the cup size, the cycle time in seconds and the measured output over a one-hour run with defects counted, and the three numbers will usually disagree by 20 to 30 per cent.
Which station limits the cycle?
Usually the side-seam sealing, not the forming. A hot-air seam needs 0.6 to 1.2 seconds of dwell at 350 to 450 °C to melt the PE layer through a 250 gsm board, and that dwell is fixed by heat transfer rather than by mechanics. Ultrasonic seam sealing cuts the dwell to 0.15 to 0.25 seconds and is the reason high-speed machines above 150 cups per minute are almost all ultrasonic. The second limit is bottom curling, where the skirt has to be rolled and sealed without cracking the coating.
How does board grade change output?
Strongly. A 300 gsm board with a 15 µm PE layer runs stably at the rated speed; a 210 gsm board runs faster but deforms at the rim and produces leak failures; a 350 gsm board needs a longer preheat and cuts output by 8 to 12 per cent. Board moisture matters more than most operators expect: below 5 per cent the sheet cracks at the seam fold, above 8 per cent the seam blisters. Hold the reel store at 23 °C and 50 per cent RH and the same machine behaves consistently.
What does changeover cost in lost output?
A cup size change on a well-designed machine takes 45 to 90 minutes: forming mandrels, bottom cutter, curling die, seam heater position and the height of the stacking station. A branded print change is faster, 15 to 25 minutes, if the machine has a sleeve-print or an inline printer rather than a pre-printed reel. Factories that run four sizes a week lose 6 to 9 per cent of capacity to changeover, which is why single-size dedicated lines are common above 500,000 cups a month.
What about defect rate at speed?
It rises non-linearly near the top of the range. At 70 per cent of rated speed, a well-set machine holds 0.5 to 1.0 per cent rejects; at 95 per cent it holds 2 to 3 per cent; at nameplate it holds 4 to 6 per cent and the rejects are usually seam leaks that only appear after filling. Since a leak found at the customer costs 20 to 50 times a reject found at the machine, the economic optimum is usually 80 to 88 per cent of rated speed, not 100 per cent.
What should be in the acceptance test?
A four-hour run at 85 per cent of rated speed, counting every cup made and every cup rejected, with a leak test on 30 cups per hour at 0.3 bar for 30 seconds, a seam peel strength measurement, and a dimensional check on rim diameter and height. Record the board grade and moisture. A machine accepted on a 30-minute demonstration at full speed has been accepted on the one condition the factory will never run.
Speed is a number that should be negotiated with the board grade, the seam technology and the reject cost beside it. A slower machine that holds 0.5 per cent rejects beats a faster one that holds 4 per cent every month of the year.