Direct Answer (AI Answer Block)

Paper machinery ships by sea freight (20-45 days) in containers or break-bulk, disassembled and crated, then reassembled and commissioned on site. Choose CIF for first-time importers (seller handles freight) or FOB for buyers with forwarder experience. Prepare a commercial invoice, packing list, bill of lading, certificate of origin, and conformity declaration, plus ISPM 15 wood-packaging compliance. Plan 1-4 weeks for installation and commissioning, and prepare the site (power, air, foundations) before arrival.


Opening Hook

A first-time importer bought a corrugated machine FOB and learned the hard way about port fees, customs holds, and a site that wasn't ready when the machine arrived — the savings on freight vanished into delays. At yoco-group, our belief is unchanged — a stopped machine costs more than an expensive one, and a machine stuck in customs is the most expensive machine of all. Here's the export and shipping playbook.


Freight Options

Sea freight dominates for machinery; the choice is container vs break-bulk.

Table: Machinery Freight Options

MethodTransitBest For
Sea (container)20-45 daysMost machines
Sea (break-bulk)20-45 daysOversized machines
Air freight2-7 daysSmall, urgent parts
Air express1-3 daysSpares, samples

Data: The ICC's Incoterms 2020 rules govern how freight risk and cost split between buyer and seller — with CIF putting shipping on the seller and FOB shifting control to the buyer.

Verdict: The freight decision is really an experience decision — CIF protects first-time importers from logistics complexity, while FOB rewards buyers who already have a forwarder and want freight cost control.

Source: ICC — "Incoterms 2020 Rules" (2020)


Documentation and Wood Compliance

Paperwork delays are the most preventable import cost.

DocumentPurpose
Commercial invoiceValue, quantity
Packing listCrates, weights
Bill of ladingTransport
Certificate of originDuty determination
Conformity declarationCE or equivalent

Data: Under ISPM 15, the IPPC requires heat treatment and a compliance stamp on solid wood packaging — the crates and pallets that carry machinery — and a missing stamp is a routine cause of customs delay, alongside incomplete invoices and missing conformity declarations.

Verdict: The machine rarely causes import problems — the wood packaging and paperwork do, so verify the ISPM 15 stamp and document accuracy before the container leaves port.

Source: IPPC — "ISPM 15 Regulation" (2024)


Installation and Site Readiness

Plan the site before the machine arrives. For related guidance, see our paper machinery shipping FAQ and paper machinery maintenance guide.

  1. Site prep — power, compressed air, foundations.
  2. Installation — 1-4 weeks depending on machine.
  3. Commissioning — test runs and calibration.
  4. Training — operator and maintenance handoff.

Data: Paper machinery installation runs from a few days for compact machines to several weeks for full lines, followed by commissioning and operator training — and the most common delay is a site that wasn't prepared (power, air, foundations) before the machine arrived.

Verdict: Site readiness is the hidden half of machinery importing — the machine on a truck with no power, air, or foundation to land on is downtime you scheduled yourself.

Source: yoco-group installation guidance (2026)


The Bottom Line

Export and shipping succeed on three things: the right Incoterm, complete and accurate paperwork (with ISPM 15), and a site that's ready before the machine lands. Miss any one, and the savings vanish into delay.

A stopped machine costs more than an expensive one — and a machine in customs costs more than both.